Triple grips, bottom plates and the fixings that hold a Pakenham East frame together

Two fixing findings from Pakenham East frames, what each one carries, and the week they are visible.

  • Pakenham East 3810
  • 12 September 2026
  • 3 min read
Get a quoteTell us what you need and an inspector will call.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

In short: Frame fixings are small, cheap and structural. A bottom plate short of fixings and missing triple grips are both load path, and both vanish behind plaster.

The bottom plate

The bottom plate is where the frame meets the slab, and its fixings are how wind load gets from the roof into the ground. Short of its required fixings means that transfer is happening through fewer points than designed.

Triple grips at the truss tie down

Triple grips tie trusses to the top plate. Missing ones break the chain between roof and wall at exactly the connection that resists uplift. We have recorded them missing on Pakenham East builds.

Judge them together

Individually each looks minor. Together they describe a load path with gaps at both ends - roof to wall, and wall to slab. That is how a frame report should be read: as a system, not a list.

Written by our local inspection team from work carried out in Pakenham East. Licensed building practitioners.

Blog

More from the Pakenham East blog

All posts →

Book a building inspection in Pakenham East

Instant online pricing for Pakenham East, or contact the booking team.

FAQ

Questions Pakenham East owners ask about this

How long is the frame window?

Usually about a week between the frame being complete and insulation or plaster starting.

Will the builder fix these without argument?

Generally yes - they are factual items against the engineering and cheap to correct at that stage.