Pre-handover (PCI) inspection in Pakenham East

The full list, room by room, while the final payment is still yours to hold.

  • Two to three weeks before your handover date
  • 2 to 3 hours on site
  • Report within 24 hours
Price your Pakenham East inspectionAddress and stage is all we need to quote.

Fully licensed & accredited

Stage7 of 7
When to bookTwo to three weeks before your handover date
Time on site2 to 3 hours on site
Inspected againstThe VBA Guide to Standards and Tolerances 2015, the NCC, your contract drawings and inclusions

What is included in a Pakenham East pre-handover (PCI) inspection

  • Every room: paint, plaster, cornices, doors, windows and floors
  • Wall and ceiling finish in natural light
  • Wet areas: tiling, grout, silicone, screens and drainage
  • Kitchen and laundry: cabinetry, benchtops and appliances installed
  • External: render, brickwork, cladding, caulking and paint
  • Roof, gutters, downpipes and stormwater connection
  • Roof space where safely accessible
  • Garage door, slab falls and driveway
  • Paths, porch, alfresco and step compliance
  • Site drainage, ponding and slab edge exposure
  • Fencing, gates, letterbox and clothesline where in contract
  • Contract inclusions and selections against what was built
  • Compliance certificates available for waterproofing, termite and glazing
  • A numbered, photographed defect list for the site supervisor
Why it matters here

Pre-handover (PCI) inspections on Pakenham East builds

At practical completion the house looks finished, which is exactly why an independent list matters. The recurring findings around Pakenham East cluster around water and air: rangehood and exhaust ducts terminating in the roof space rather than outside, capping flashings shaped so they retain water, junctions between cladding types left unsealed, shower screen channels not sealed at the wall. Add the safety items, such as non compliant external power point wiring and sharp edges on boundary fencing, and the list is usually long enough to justify a reinspection before you sign.

What we find at this stage in Pakenham East

  • Rangehood and extraction ducts terminating in the roof space
  • Capping flashings retaining water rather than shedding it
  • Unsealed junctions between different cladding types
  • Shower screen wall channels not sealed
  • Non compliant external power point wiring
Flashing left incomplete at the roof, Pakenham East
Flashing left incomplete at the roof
Sample findings

Sample defects found during our pre-handover (PCI) inspections in Pakenham East

Annotated findings from Pre-handover (PCI) inspections on Pakenham East builds. Client addresses withheld.

Rangehood exhaust duct not installed, recorded on a pre-handover inspection in Pakenham, 4 km from Pakenham East
Rangehood exhausting into the roof cavity
Capping flashing water retention, recorded on a pre-handover inspection in Pakenham, 4 km from Pakenham East
Capping flashing holding water
Unsealed junction between cladding types, recorded on a pre-handover inspection in Pakenham, 4 km from Pakenham East
Cladding junction left unsealed
Non compliant external power point wiring, recorded on a pre-handover inspection in Nar Nar Goon, 5 km from Pakenham East
External power point wired non compliantly

The other stages of a Pakenham East build

  1. Bored piers inspection in Pakenham East1Bored piersAfter boring and cage placement, before any concrete goes in
  2. Slab pre-pour inspection in Pakenham East2Slab pre-pourThe day before the pour, steel and formwork complete and open to view
  3. Frame inspection in Pakenham East3FrameOnce the frame and trusses are up and the roof is on, before sarking and lining
  4. Lock-up (pre-plaster) inspection in Pakenham East4Lock-up (pre-plaster)After roof, cladding and external doors are on, before the plasterer starts
  5. Fixing inspection in Pakenham East5FixingAfter mouldings, doors and joinery, before the painter
  6. Waterproofing inspection in Pakenham East6WaterproofingAfter the membrane is applied and before any tile is laid over it

All construction stage inspections in Pakenham East →

Guides

Construction stage guides for Pakenham East

All guides →

Book a pre-handover (pci) inspection in Pakenham East

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-handover (PCI) inspections in Pakenham East: common questions

When should the inspection happen?

Two to three weeks before your handover date. Any later and there is no room for the builder to rectify, which turns the list into a settlement argument instead of a work order.

Do you come back and check the fixes?

Yes. The reinspection marks each item as rectified, partly done or outstanding, and that document is what you take to the handover meeting.

Can I attend the inspection?

You are welcome to, and many owners do. It is a useful couple of hours because you see the items in place rather than only in a report, and you can ask about anything as we go.

How many items is normal?

A list in the dozens is ordinary on a new build and is not by itself a sign of a bad builder. What matters is the split between structural and cosmetic, which the report makes explicit.

What if the builder disputes an item?

Each item cites the clause, tolerance or standard it fails, so the discussion moves onto that document rather than onto opinion. Where a dispute persists, the Victorian dispute pathway starts with the Building and Plumbing Commission's dispute resolution service.

Is a duct in the roof space really a defect?

Yes. An exhaust that discharges into the roof cavity puts warm moist air into the one place you least want it, and over a few winters that shows up as damp and mould in the ceiling.